Use casesMulticam

Sync multicams and get to the timeline

Save aligned recordings, production sound and selects in a team project for each episode, cutdown and NLE handoff.

Download

You have overlapping coverage from two to four cameras, separate sound and recordings of different lengths. The editor needs to know which placements are supported before cutting, and the same sources may serve a later version.

How Stringout solves this

01

How do I align cameras that start and stop at different times?

Add the recordings to a project, including each camera restart as its own source. Stringout can group two to four overlapping angles and place separate sound against the picture using available timecode, slate and audio evidence. Each recording keeps its own start and end, so a short angle does not have to fill the continuous camera’s whole roll.

Illustrative Stringout project timeline with staggered wildlife picture clips on two video lanes and a sample sound-roll placement on an audio lane.
Illustrative example: review staggered camera recordings and separate sound.

02

How can I spot uncertain sync before the NLE handoff?

Project files show Synced, Provisional or Needs review when they belong to a sync group. Provisional means a placement still lacks confirming evidence; Needs review means the evidence conflicts. Export preflight counts conflicting and unverified clips before handoff, so you can flag those sources instead of presenting every placement as settled.

Screen capture sequence

Sync status carried into export preflight

Record the actual Stringout Browser sync badge and export preflight for a project with an unresolved placement. Show the source status and the resulting conflicting or unverified count. Use only the existing status and export surfaces.

  1. Open a project containing a real provisional or conflicting sync placement.
  2. Show the source’s Sync column badge in the Browser.
  3. Choose a supported NLE target from the project export menu.
  4. Show the preflight warning and its conflicting or unverified count.
Screen capture placeholder

03

Can I reuse the aligned sources for a later cut?

Yes. The camera and sound recordings remain indexed in the project for another pass. Auto-assemble or a connected assistant can propose source-range selections from them; review those ranges against the recordings before using them.

Export the sequence as aligned clips on separate lanes for Premiere, Resolve or Final Cut Pro. The receiving editor chooses the angles and sound treatment in the NLE.

The result

Aligned sources the editor can revisit

The project keeps the indexed camera and sound recordings for another cut. The NLE handoff places aligned clips on separate lanes, leaving shot choice and sound treatment to the editor.

Start for Free